Installation: Installation 43
INSTALLATION
FILL STATION PLUMBING INSTALLATION
1. Assemble the valve assembly as shows in the images below. Apply the provided thread sealant to all threaded
joints.
FIGURE 61. Tank 2 (Front) Fill Station Valve Assembly
FIGURE 62. Tank 1 (Rear) Fill Station Valve Assembly
2. Assemble the couplers as shown in the image below. Seal all threaded joints with the provided pipe thread
sealant.
M100 to 1” Hose
Barb
M100 Clamp and M100 Gasket
M100 to 3/4” NPT
3/4” NPT to 1” Hose
Barb Elbow
Fill Valve
M100 to 3/4” NPT
To Pump Station
To Tank 2
M100 to 3/4 NPT
M100 to 3/4
M100 Clamp and Gasket
(may require provided
M100 Straight Coupler,
M100 Clamp, and M100
Gasket to connect to Tank
1 hose on some machines)
3/4” NPT to 1” Hose
Barb Elbow
Fill Valve
M100 to 1” Hose Barb
Elbow
To Pump Station
To Tank 1