EasyManua.ls Logo

Raven Sidekick Pro - Fill Station Operation; Pump Valve Operation

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
58 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FILL STATION
FIGURE 2. Fill Station
Each fill station can be set to fill (arrow down), off (arrow left), or to the pump number (arrow up).
PUMP VALVES
Single pumps have three valves. There is a valve to set the tank flow (tank 1 or tank 2), to turn the flow to the boom
on or off, and a pump or drain valve.
FIGURE 3. Single Pump Valve
Dual pumps have two valves on each pump. One valve switches between the tank or the boom, the second valve
is for selecting pump or drain.

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals