EasyManua.ls Logo

Raven Sidekick Pro - Installation Procedures; Installation Preparation

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER
3
Installation: Installation Preparation 11
CHAPTER 3
INSTALLATION
INSTALLATION PREPARATION
Verify Software version 2.1.5.32 or higher is present on the Raven Viper 4, or that Version 30 or higher is
present on the Case IH Pro 700 controller if equipped.
SYSTEM CLEANOUT
Remove all pressure from plumbing components. Drain out the main carrier tank, rinse tank, and boom plumbing.
TANK AND PLUMBING PREPARATION
NOTE: If the machine has preexisting component mounting provisions show below, proceed to the bracket
installation section.
FIGURE 1. Component Mounting Provisions
1. Move the machine to a safe area with enough space to unfold the main boom.
2. Unfold the boom and lower center section to allow access to the main frame towers cross tubes. Support the
center section of the machine (if necessary).
3. Disconnect the machine battery and the cables from the field computer or controller in the cab.
NOTE: Failure to disconnect electrical before welding on the machine can damage electrical components.
Preexisting
Hole Pattern
Rear Axle
Frame
Support
Located on
Main Frame
Towers

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals