CHAPTER 3
28 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 34. Installed Reflector Decals
TANK AND TANK CAGE INSTALLATION
1. Secure the left and right tank cage to the upper tank support using the provided 1/2 washers, 1/2 - 13 x 1-3/4
bolts, and 1/2” nyloc nuts. Tighten all nuts to 75 ft-lbs.
FIGURE 35. Tank and Tank Cage
2. Install the tank so that the tank lid faces towards the front of the machine.
MIXER INSTALLATION
MIXER INSTALLATION
1. Install the mixer to the upper center boom section of the machine with the supplied 3/8” - 16 x 2-1/2” (for 120’)
or 1-5/16” u-bolts (for 90’ - 100’), 3/8” washers, 3/8” spacers (for 120’), and 3/8” nyloc nuts.
NOTE: Place the mixer so that the inlet check valve is on the right side of the machine with the center of the
mixer approximately 4” right of the center boom.
Orange
Red
Lid
(118-0159-043)
Tank
(118-0159-059)
Tank Cage
(116-0159-759)
1/2”
Hardware

Table of Contents