Installation: Installation 23
INSTALLATION
FIGURE 25. Fill Station Installed
TANK SUPPORT BRACKET INSTALLATION
UPPER SUPPORT ARM INSTALLATION
1. Install the left and right upper support arm into the upper cross tubes. Align the holes in the cross tubes with
threaded holes in the upper support arm.
Platform
3/8” Bolts
Fill Station
(116-0159-772)
Frame Fastener Plate
(107-0172-339)