EasyManua.ls Logo

Raven Sidekick Pro - Installation; Pump and Fill Station Installation

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3
18 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
INSTALLATION
PUMP AND FILL STATION INSTALLATION
PUMP STATION
1. Install the pump station to the right side of the machine, in front of the battery box, using the supplied fastener
plates, 3/8” - 16 x 6” or 8” bolts, 3/8” washers, 3/8” spacers, and 3/8” nyloc nuts.
NOTE: To accommodate the pump bracket and shield, it may be necessary to loosen the bolts that secure
the battery box to the frame and slide the battery box as far as possible towards the rear of the
machine.
FIGURE 16. Pump Station Installation
3/8” Bolts
6” for 32xx Machines
8” for 33xx, and 4XXX
Machines
Battery Box
Frame Fastener
Plates
(107-0172-339)
Pump Station
(116-0159-765)

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals