CHAPTER 3
44 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 63. Coupler Assembly
3. Secure the valve assemblies to the fill station using 5/16” clamping u-bolts, 5/16” washers, and 5/16” nyloc nuts.
NOTE: Secure the valve assembly to the upper portion of the fill station before installing the coupler
assembly into the lower portion. Do not over tighten as it will damage the valve.
FIGURE 64. Installed Coupler Assembly
M100 to 1” NPT
1” Male Fill
Coupler with
Cap
Coupler
Assembly
Clamping U-Bolt
Valve Assembly
NPT Hose
Barb Elbow
M100 Clamp and
M100 Gasket
Fill Station
(116-0159-772)