Installation: Installation 47
INSTALLATION
FIGURE 68. Tank Overflow Hose Routing
1. Route the hose down the side of the tank cage support brackets.
2. Secure the hose to the tank cage and brackets with the provided cable ties.
3. Cut the hose so it exhausts slightly below the machine axle and fluid will not contact the frame.
FILL STATION
1. Apply the provided thread sealant to all threaded joints.
2. Connect one end of the supplied 1” braided hose to the open 1” hose barb fittings on the top of the rearmost
fill station valve.
FIGURE 69. Fill Station Hoses
Nylon Hose Guard
Sleeve
To Pump Station
(Pump 2 or
frontmost hose
barb fitting)
To Pump Station
(Pump 1 or rearmost
1” hose barb fitting)
From Tank 2 (right
side of machine)
From Tank 1 (left
side of machine)