EasyManua.ls Logo

Raven Sidekick Pro - Page 71

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Viper 4 (ROS) Initial Set-Up: Sidekick Pro™ Injection Pump Priming and Calibration 69
VIPER 4 (ROS) INITIAL SET-UP
FIGURE 3. Sidekick Pro Pump Calibrator
5. Verify the following conditions are present:
a. Injection pressure is less than 12 PSI [82.7 kPa].
b. Pump is in the off condition.
c. Vacuum pressure less than 11.5 inches of mercury [29 cm of mercury].
FIGURE 4. Vacuum Switch
NOTE: The vacuum switch on the pump will engage and a flow alarm will be displayed if product cannot be
drawn into the pump (e.g. vacuum pressure at or above 11.5 inches of mercury [29 cm of mercury]).
Check screens, hose diameter and any hand valves between the chemical tank and pump inlet. Also,
verify that the product is flowing freely. Cold temperatures and low viscosity products may cause high
vacuum pressures and cause the pump not to operate properly.
Remove
Cover
Push
Plunger
Down
Install
Cover
Calibration
Window
Vacuum Switch

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals