EasyManua.ls Logo

RichAuto A11 - Page 56

RichAuto A11
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RichAuto S & T Co., Ltd
Add: 5th
floor, No.4 building, No 4. Yard, life Rd, life science park, beiqing St., changping district Beijing, China
Tel010-53275118 Fax010-53275110/53275111 Web sitewww.richnc.com.cn
51
or you can go to “AUTO PRO SETUP”, choose “Work Array” and modify
the array parameters. The rest steps are similar to the normal processing.
System will start to work according to the users setting.
4) In the processing of array work, you can view current row number, volume
number etc. by pressing “ ”.
2. Resume work
Steps are as follows:
Press “ ” to move cursor to resume work, press “ ” to
enter, then press or to select different break points, and
then press ”, system will restore processing from the break point. If
you want to go backwards from this breakpoint, press “ ”and input the
line No., and then press ”, system will work from the new line
number.
3. Tool changing
It achieve manually change the tools at the position you set. Press to
enter into the setup, and also press “ ” back to work origin.
4. Part work
Park work means user can select start line and stop line, so part of the
processing file can be processed. The steps are as follows:
1) Press ”to set, press and to move the cursor to

Related product manuals