EasyManua.ls Logo

Rollo Solar RT 200 - Distribution Box Preparation; Grounding and Connection Prep

Rollo Solar RT 200
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page | 10
PREPARING THE DISTRIBUTION BOX
(1) Grounding
(2) Connecting piece with internal cable gland (2 pieces)
(3) Screw-type blank cap (optional additional connecting piece with cable gland)
Installation steps
1. Install the connecting pieces with internal cable gland (2)
2. Install the screw-type blank cap (3) or, if necessary, a third connecting piece
(optionally available)
1
2
2
3

Table of Contents

Related product manuals