EasyManua.ls Logo

Rollo Solar RT 200 - Alternative Cable Routing Method; Direct Routing through Distribution Box

Rollo Solar RT 200
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page | 21
ALTERNATIVE ROUTING FOR THE CABLE
The cable can alternatively be routed directly into the technical system; in this case,
please put the distribution box in place and guide the cable through the distribution box
(see image).
(1) Cable gland (2 pieces)
Installation steps
1. Slide the rubber plug (1) onto the respective end of the cable as shown
2. Hand-tighten the cable gland (1) using a VA universal pliers.

Table of Contents

Related product manuals