EasyManua.ls Logo

Rollo Solar RT 200 - Distribution Box Cover Installation; Placing the Final Cover

Rollo Solar RT 200
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page | 23
PLACE THE COVER ON THE DISTRIBUTION BOX
(1) Cover of the distribution box for final installation + countersunk screws
(2) Cover of the distribution box during building period + round-head screws
Caution! Make sure that the distribution box is accessible at all times. The distribution
box must be installed on the edge of the pool and accessible at all times.
Installation steps
1. Building phase: Wait until the gel is solid. Now use a VA Phillips screwdriver to screw
the distribution box together with the O-ring and the plastic cover. Use the three
round-head screws
2. Final installation: Wait until the gel is solid. Now use a VA Phillips screwdriver to
screw the distribution box together with the O-ring. Use the three countersunk
Phillips screws.
1
2

Table of Contents

Related product manuals