EasyManua.ls Logo

Rollo Solar RT 200 - Initial Setup and Components; Initial Start-up Procedure; Scope of Delivery and Tools

Rollo Solar RT 200
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial start-up
Caution! The qualified specialist performing the installation must start up the system and provide
instructions to the operator. The operator must be provided with information regarding all
protection regulations and due diligence which must be observed.
Scope of delivery
The scope of delivery is indicated on the delivery note. When unpacking it, please check the
contents promptly to ensure that the delivery is complete. If any parts are missing or damage has
occurred during transport, please inform the retailer/manufacturer immediately.
1. Motor with cable (green)
2. Actuator pin or key
Tools
Caution! Please ensure that only special tools (VA stainless steel) are used during the installation.
The following tools/accessories are required for the installation.
VA universal pliers
VA ring spanner with M8 or M10 size
VA Phillips screwdriver
VA Allen key
Ceramic paste
Wire stripper + phase tester
Raytech gel + pot and stirrer
Personal protective equipment (protective eye wear, gloves, safety shoes)

Table of Contents

Related product manuals