OM-610-1002-1 Operator’s Manual Rev 37
PDS-2010 SECTION 4 INSTALLATION page 11
The PDS 2010 has been wired to accept the voltage and frequency requirement specified on the
original purchase order. If this should change, contact the SCS Customer Service department for
instructions to change the control transformer primary side wiring connections.
Replace all access panel covers.
4.8 CHILLER (Option)
Insert the Chiller Probe down into the cold trap base.
An access socket is available at the rear of the chiller for temperature sensing (thermostat).
4.9 LIQUID NITROGEN (Option)
Insert the Liquid Nitrogen Probe down into the cold trap base.
Connect the liquid nitrogen supply line to the fitting on the LN
2
probe.
4.10 TUMBLER (Option)
The tumbler uses a special chamber with a removable lid.
Reference drawing AD-285-1161 in Section 7.
Remove the side panels from the PDS 2010.
Remove the lid from the chamber and set it aside.
Remove the viewport from the chamber and set it aside. Use care not to break the quartz window.
Locate and drill a 7/8” diameter hole as shown. Place the receptacle in the hole and transfer the
mounting holes. Drill 4-1/8” holes and mount the connector with the hardware supplied.
Wire the connector as shown on drawing AD-285-1161 in Section 7.
Mount the tumble drive in the viewport flange on the chamber. Do not forget to include the O-
Ring.
Insert the carriage assembly through the top of the chamber and bolt to the drive assembly with
the hardware supplied.
Plug the power cord into the receptacle.
Replace the side panels on the PDS 2010.
4.11 CONNECT AND CHECK
Connect power to the unit.
Lift the Emergency stop button. The white Main Power light should come on.