Rev 37 Operator’s Manual OM-610-1002-1
page 12 SECTION 4 INSTALLATION PDS-2010
4.12 ON SITE SERVICE PROVIDED BY SCS CUSTOMER SERVICE (Optional)
Check all facility services for correct values before operating the system.
Turn the system power on and systematically verify proper operation of all functions.
Verify proper operation of Emergency Stop pushbutton.
After the system is fully functional, perform the initial product processing assistance, to provide
the benefit of operational experience to the customer.
Provide safety, start-up, operation, shutdown, and maintenance training for operators of the
PDS 2010.
Review the PDS 2010 Operator’s Manual, electrical schematic, and parts lists.