EasyManua.ls Logo

SICK FLOWSIC100 Flare - Page 40

SICK FLOWSIC100 Flare
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40 FLOWSIC100 Flare · Addendum to Operating Instructions · 8025365/V1-0/2020-05 · © SICK Engineering GmbH
Installation
Fig. 20 Marking the nozzle positions on the pipeline for cross-duct versions
1-path measurement 2-path measurement
6) Roll the strip back around the pipeline and mark the nozzle positions with crossing and marking points by using a metal center punch.
7) Take the strip off again and join the additional markings with a line.
Crossing point (marking for
the center of the nozzle)
Marking point (aid for
aligning the nozzle)
Path 1
Path 2
Path 1
Path 2
Crossing point (marking for
the center of the nozzle)
Marking point (aid for
aligning the nozzle)
Marking lines
Marking lines

Table of Contents

Other manuals for SICK FLOWSIC100 Flare

Related product manuals