System Operation Centrifuge Module Interface Operating Instructions
page 42 092D0001-02 Rev. A
To access Pre and Post Tests (Shift F5) screens, perform the following
steps:
1. On the LineMaster workspace, select System > Pre and Post Tests
(Shift F5).
2. Select the appropriate tab:
• By LIS Code, the default
• By Sample Type
•By Location
• Location Override
• Usage
By LIS Code Tab
The By LIS Code tab of the Pre and Post Tests (Shift F5) screen assigns the
Centrifuge pre-test to 1 or more tests.
Figure 6: Pre and Post Tests (Shift F5)–By LIS Code Tab