System Operation Centrifuge Module Interface Operating Instructions
page 46 092D0001-02 Rev. A
Usage Tab
The Usage tab of the Pre and Post Tests (Shift F5) screen displays all
Centrifuge pre test assignments.
Figure 10: Pre and Post Tests (Shift F5)–Usage Tab
On the Pre and Post Test area on the left, select the Centrifuge pre-test.
The Source area on the right displays all assignments for the pre-test.