EasyManua.ls Logo

Siemens ADVIA LabCell - Usage Tab for Pre-Test Assignments

Siemens ADVIA LabCell
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Operation Centrifuge Module Interface Operating Instructions
page 46 092D0001-02 Rev. A
Usage Tab
The Usage tab of the Pre and Post Tests (Shift F5) screen displays all
Centrifuge pre test assignments.
Figure 10: Pre and Post Tests (Shift F5)–Usage Tab
On the Pre and Post Test area on the left, select the Centrifuge pre-test.
The Source area on the right displays all assignments for the pre-test.

Table of Contents

Related product manuals