EasyManua.ls Logo

Siemens NXAIR - Page 215

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the busbar current metering panel
110-0134.9 / 14 NXAIR / 40 kA 215
Preconditions
High-voltage door open
Hexagon socket head key size 6 available
Procedure
Close the high-voltage door using the handle (2).
Fig. 379: High-voltage door at the busbar current metering panel
Screw in 6 hexagon socket head bolts size 6 (1) by hand force. This corresponds to a
tightening torque of approx. 20 Nm.
The high-voltage door is closed.

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals