EasyManua.ls Logo

Siemens NXAIR - Page 261

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the removable voltage transformers
110-0134.9 / 14 NXAIR / 40 kA 261
Mount the contact cap on the new protection fuse-link.
Insert the new protection fuse-link.
Perform replacement with all other fuse-links.
The protection fuse-links have been replaced.
INFORMATION
Final procedure steps
Next, insert the removable voltage transformers into the panel. After
closing the high-voltage door, the panel can be integrated into the course
of operation again.
Procedure for design types 2, 3 and 4: Tool required
Hereafter, the procedure is shown using the example of a removable voltage transformer type 2. For design
types 3 and 4, the procedure is basically the same. Those types differ from type 2 only in that the contact
caps are interlocked with the housing by a screw thread. The contact caps are unscrewed by turning counter-
clockwise using the accessory tool:
Fig. 474: Tool for
(un-)locking
Fig. 475: Type 3: Unscrewing
the contact cap
Fig. 476: Type 4: Unscrewing
the contact cap
Move the service truck with the removable voltage transformers away from the panel.
The protection fuse-links are covered by contact caps which are interlocked by a guide pin
with the housing of the voltage transformer.

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals