EasyManua.ls Logo

Siemens NXAIR - Page 322

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessing the connection compartment through the front
322 NXAIR / 40 kA 110-0134.9 / 14
Tighten the front bolts at the base frame hand-tight. Tighten the bolts with a tightening torque
of 25 Nm.
Fig. 595: 2 bolted joints on base frame front
Tighten the lateral bolts M8x20 at the vertical partition and the base frame hand-tight.
Tighten the bolts with a tightening torque of 25 Nm. Proceed in the same way on the other
side.
Fig. 596: 6 bolted joints fixed laterally on
base frame and partition
Tighten the upper bolts M8x20 at the vertical partition hand-tight. Tighten the bolts with a
tightening torque of 25 Nm.
Fig. 597: 4 bolted joints on partition

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals