Service information
110-0134.9 / 14 NXAIR / ≤ 40 kA 423
Preconditions
• High-voltage door closed
• Release for checking the overpressure monitors available
• Uninterrupted communication established with the operator at the central control
• Door to the low-voltage compartment open
• Test unit available, locking cap firmly screwed on
Fig. 750: Low-voltage compartment,
for example with 2 overpressure monitors
Detach the tube to the compartment (7) from the tube connector (6). To do this, push the
detachment ring (8) at opposite points towards the tube connector, and ─ at the same time ─
pull the tube to the compartment out of the tube connector in opposite direction.
Lab bottle made
of polyethylene