832-6063.0 * OPERATION SIMOSEC * REVISION 02 85
Operation
20.4 Switching the make-proof grounding switch to OPEN position
Obtain clearance for removal of ground in accordance with established procedu-
res for lockout-tagout complying with OSHA regulations and NFPA 70E.
Verify that all work requiring grounding has been completed
Verify that all personnel are clear of conductors
Verify that any temporary grounds or short-circuits have been removed
Verify that all covers have been reinstalled
Ö Remove padlock (if present) from control gate of make-proof grounding switch.
Ö Push control gate of make-proof grounding switch to the left and hold.
Ö Insert operating lever (with red grip) onto operating shaft of operating mechanism.
Ö Move operating lever up to the "OPEN" position.
r The bus bar grounding switch is in the de-grounded position.
Ö Remove operating lever.
Ö Install padlock at center position of control gate of make-proof grounding switch (if
desired).
Ö Stow away operating lever.
The make-proof grounding switch is protected against unauthorized use, if the
control gate is padlocked.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOSEC and is the answer not in the manual?

Siemens SIMOSEC Specifications

General IconGeneral
BrandSiemens
ModelSIMOSEC
CategoryPower distribution unit
LanguageEnglish

Related product manuals