5. Wait until all inverter LEDs are dark.
6. Switch on the inverter power supply again. Your settings become effective after switching
on.
You have transferred the settings to the inverter.
Saving settings and series commissioning
7.3 Saving settings to an operator panel
SINAMICS G120C converter
338 Operating Instructions, 09/2017, FW V4.7 SP9, A5E34263257B AF