11/03 Operation
SINAMICS G150
Operating Manual
6-31
To next bus node
First bus node
on
off
Bus terminator
on
off
on
off
Bus terminator
From previous
bus node
Last bus node
Fig. 6-19 Position of the bus terminating resistors
Cable Routing
Entry of PROFIBUS cable
from above into electronics
board
Shield connection
Route bus cable along
available cable line and
fasten it to this line with cable
ties
To pass the cable through,
the bus connector has to be
dismantled
Fig. 6-20 Cable routing