11/03 Commissioning
SINAMICS G150
Operating Manual
5-3
5.3 Initial Commissioning
5.3.1 Initial Ramp-Up
Start Screen
When the system is switched on for the first time, the control unit (CPU) is
initialized automatically. The following screen is displayed:
SINAMICS
s
F2F1 F3 F4 F5
Initialisierung: CPU-Start ....
Fig. 5-2 Initial screen
While the system is ramping up, the internal statuses are displayed in the bottom
line of the operator panel.
Once the system has successfully ramped up, the drive has to be commissioned
when the system is switched on for the first time after it has been delivered. The
converter can then be switched on.
When the system is then ramped up again, it can be operated immediately.