EasyManua.ls Logo

Siemens SINAMICS G150 - Required Tools

Siemens SINAMICS G150
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11/03 Electrical Installation
SINAMICS G150
Operating Manual
4-5
Item Activity Fulfilled/Complete
22 Option L87
Insulation
monitoring
The insulation monitor can only be operated with the
insulated-neutral system. Only one insulation monitor
may be used in one electrically connected network. For
system-side control, the signaling relays must be
connected accordingly or, with individual drives (the
cabinet unit is fed via a converter transformer assigned
to the cabinet unit), integrated in the cabinet unit warning
train (see 4.9.13).
Point 7 must also be taken into account: Before the
cabinet is operated from an ungrounded supply/IT
supply, the connection bracket for the interference-
suppression capacitor must be removed (see 4.6.5).
Required Tools
To install the connections, you will require:
• Spanner or socket spanner (w/f 10)
• Spanner or socket spanner (w/f 13)
• Spanner or socket spanner (w/f 18/19)
• Hexagon-socket spanner (size 8)
• Torque spanner, max. 50 Nm
• Screwdriver, size 2
• Screwdriver Torx T20
• Screwdriver Torx T30

Table of Contents

Other manuals for Siemens SINAMICS G150

Related product manuals