4 Organizational tasks 12/2008
4.1 Maintenance
© Siemens AG 2008 All Rights Reserved
4-174 ePS Network Services, Function Manual (FH) - Release 12/2008
• The types of axis test configured, as well as how many are included in this
combined axis test
Once axis tests have been performed, their results can be viewed from this point in
a submenu.
Field Content Type
Open (axis test) Axis test data recorded for a
maintenance job is displayed along with
its test parameters, and can be viewed
in the associated data series.
DISPLAY
Notice
In the case of maintenance procedures that include axis tests, it is highly
recommended that the status of the maintenance job be set to "open" while the
axis test is being performed. Otherwise, this may result in faulty axis tests if a
third party accesses the configurations.
4.1.3 Executing/closing a maintenance job (HMI)
Description of functions
Maintenance personnel can view jobs in the ePS Network Services menu
(Maintenance services Maintenance jobs) on the machine HMI, and can also
open them from here.
To limit the length of execution for maintenance procedures, there is the option of
protecting the maintenance job from entries and changes when it is opened. Third
parties will see that the maintenance procedure is already taking place and will be
acknowledged with the appropriate status (see Section 2.3 "Test series on the
machine").
Function Description
Execute maintenance job The maintenance personnel can edit maintenance
jobs that are due:
• Open (block for third-party access)
• Add and change comments
• Acknowledge as correctly executed
• Acknowledge as incorrectly executed, if this is not
possible. It may be advisable to add a comment in
such cases.