INSTALLATION
20221529 / C 41
Configuring the Control unit
When the gyro system is shipped from factory, all dip switches
in the Control unit are set as for a standard GC80 system.
Before the system is started, dip switch no.2 on S1 on the SCC
board has to be changed to identify the system as a GC85
system.
The SCC board is located underneath the GTERM board.
J1
J4
J3
J2
6
1ON
8
1ON
SW4
8
1ON
SW3
SW2
SW1
ON
8
1
DS1
DS2
DS3
DS4
DS5
DS6
12
12
12
56
12
34
1
3
2
4
1
3
2
4
J5
J6
J7
J8
J9
J10
U1
U52
BT1
SCC board
GC80 system GC85 system
OFF
S1
1
8
S1
8
1
ON
SCC
BOARD
SW1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad GC80 EXPANDED and is the answer not in the manual?

Simrad GC80 EXPANDED Specifications

General IconGeneral
BrandSimrad
ModelGC80 EXPANDED
CategoryCompass
LanguageEnglish

Related product manuals