0607SE Maintenance Manual 4-1 © Jan 2022
4 SERVICE AND GUIDELINES
MACHINE PREPARATION,
INSPECTION AND
MAINTENANCE
GENERAL
This section provides safety and necessary information
for the machine operators. For maximum service life
and safe operation, ensure that all necessary
inspections and maintenance have been completed
before placing the machine into service.
Machine positions
Stowed position:
The machine comes in stowed position when fully
retracted.
Non-operating position:
The machine remains in non-operating position when
the down limit switch does not disengage.
Operating/raised position:
The machine comes in operating/raised position
when the platform is raised until the down limit switch
disengages.
Note:With the down limit switch disengaged, the
platform height (from ground to platform floor) is 2
±0.3m (9ft 10in±12in).
PREPARATION, INSPECTION AND
MAINTENANCE
It is important to establish and conform to a
comprehensive inspection and preventive maintenance
program. This manual outlines the scheduled machine
inspections and maintenance recommended by Hunan
Sinoboom Intelligent Co., Ltd., Consult your national,
regional or local regulations for aerial work platforms.
The frequency of inspections and maintenance must be
increased as environment, severity and frequency of
usage requires.
QUALIFIED SINOBOOM EQUIPMENT
MECHANIC
Qualified Sinoboom equipment mechanic is a person
recognized by Sinoboom as one who, by possession of
a recognized degree, certificate, training, has
successfully demonstrated the ability and proficiency to
service, repair and maintain the subject Sinoboom
product model.
PRE-OPERATION INSPECTION
Prior to daily use or work shift of operators, the user or
operator should perform a pre-operation inspection.
Refer to the Operation Manual for the complete
procedure for the pre-operation inspection. The
Operation Manual must be entirely read and
understood before performing the pre-operation
inspection.
PRE-DELIVERY INSPECTION AND
FREQUENT INSPECTION
The pre-delivery inspection shall be performed by
qualified Sinoboom equipment mechanic. The pre-
delivery inspection and the frequent inspection are
performed in the same manner, but at different times.
The pre-delivery inspection shall be performed before
each sale, lease or rental delivery. The frequent
inspection shall be accomplished for each machine in
service for 3 months or 150 hours (whichever comes
first); out of service for a period of more than 3 months;
or when purchased used machine. The frequency of
this inspection must be increased as environment,
severity and frequency of usage requires.
Refer to the Prepare the Work Record before Delivery
and Repair & Inspection Report for items requiring
inspection. Refer to the Inspection Procedures in
appropriate section of this manual to perform the
inspection and maintenance procedures.
ANNUAL MACHINE INSPECTION
The annual machine inspection must be performed on
an annual basis, no later than 13 months from the date
of the prior annual machine inspection. Hunan
Sinoboom Intelligent Equipment Co., Ltd. recommends
this task be performed by a factory-trained service
technician, a person recognized by Sinoboom as one
who, by possession of a recognized degree, certificate,