EasyManua.ls Logo

Sinoboom 0607SE - CHECKLIST A PROCEDURES; A-1 Inspect All Manuals

Sinoboom 0607SE
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
0607SE Maintenance Manual 5-5 © Jan 2022
4. The machine must be inspected and verified after
major modifications/repairs, with the inspection
items including but not limited to all items in the
maintenance and inspection report.
5. If the inspection result of each item in the
Maintenance and Inspection Report is “YES”, the
“Machine Status after Modification/Repair” in the
form will be “Good” and the machine can be used. If
either inspection result is “NO”, the machine must
be re-inspected after the repair is completed until
the machine is in “Good” condition before
continuing to use the machine.
Table 5-4
Major Modification and Repair Record
Model
Serial No.
Date
Problem Description Modification/Repair Item
Machine
Status
af-
ter Change
Repairman’s
Company and
Position
Repair-
man
Signature
CHECKLIST A
PROCEDURES
A-1 Inspect All Manuals
Storing the Operation Manual and the Maintenance
Manual in the appropriate place is important for the
safe operation of the machine. The manuals must be
stored in the manual storage container on the platform.
Illegible or damaged manuals cannot provide
necessary safety and operation information for safe
operation.
Inspect and confirm that the manual storage
container is placed on the appropriate position of
the platform.
Inspect and confirm that the Operation Manual and
the Maintenance Manual are stored in the manual
storage container on the platform.
Inspect the pages of the manuals and confirm that
they are legible and intact.
Inspect the pages of the manuals and confirm that
they are legible and intact.

Table of Contents

Related product manuals