EasyManuals Logo

Skov BlueControl Insect User Manual

Skov BlueControl Insect
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
BlueControl Insect
26 Technical User Guide
7 Work routine
This technical manual deals with the installation of the controller and is aimed primarily at the technicians and
electricians who will be mounting, installing and testing the controller.
According to current national and in Europe also EU regulations, the installation must be carried out by expert
personnel.
Note that electrical equipment may not be opened without removing the supply voltage, and only competent per-
sonnel may carry out servicing operations and troubleshooting.
The following checklist indicates the main points of the workflow regarding set up of the controller.
Mounting
1. Controller.
2. Emergency opening, if applicable.
Installation
1. Connect cables according to the circuit diagrams for the emergency opening of the system.
2. Set voltage in the controller.
3. Connect mains voltage to the controller.
4. Select components in the controller menu Installation | Installation wizard by reviewing all the in-
stallation menu items in the Installation wizard.
5. Connect the individual components by means of the controller's menu Installation | Show connec-
tion and the circuit diagrams.
6. Adjust the system.
7. Test the system.
Start-up
1. Setting and calibration.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skov BlueControl Insect and is the answer not in the manual?

Skov BlueControl Insect Specifications

General IconGeneral
BrandSkov
ModelBlueControl Insect
CategoryControl Unit
LanguageEnglish

Related product manuals