EasyManua.ls Logo

Skyjack SJ12 E - 4.2 Visual and daily maintenance inspections

Skyjack SJ12 E
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
SJ12 E, SJ16 E, SJ20 E243762ABA
Section 4 – Inspections Before Operation
Visual and daily maintenance inspections
4.2 Visual and daily
maintenance inspections
Do an inspection of the MEWP in this sequence.
CAUTION
Make sure that the MEWP is on a rm, level
surface before you do the visual and daily
maintenance inspections. If you do not obey, there
is a risk of machine damage.
WARNING
Turn the main power disconnect switch to the
off position before you do the visual and daily
maintenance inspections. If you do not obey, there
is a risk of death or serious injury.
WARNING
Do not operate a MEWP that does not function
correctly. Lock and tag the MEWP and remove it
for servicing. Only a qualied service technician
must repair the MEWP. If you do not obey, there is
a risk of death or serious injury.
4.2-1 Labels
Refer to Section 8 for the labels. Make sure all the labels
are in the correct location, are in good condition, and
you can read them.
4.2-2 Electrical
Do a check on these areas for chafed, corroded, and
loose wires:
Base to platform cables and wiring harness
Hydraulic and electrical compartment wiring
harnesses.
4.2-3 Limit switches
Make sure the limit switches
1
are correctly
attached with no visible damage, and the movement
is not blocked.
4.2-4 Hydraulic
Do a check on these areas and make sure there are
no signs of leakage:
Hydraulic tank, lter, ttings, hoses
All hydraulic cylinders
All hydraulic manifolds
The ground area below the MEWP
1
1

Table of Contents

Other manuals for Skyjack SJ12 E

Related product manuals