Open the hydraulic/electrical compartment Section 6 – Additional Procedures
6.6 Open the hydraulic/
electrical compartment
1. Make sure the MEWP is on rm, level ground.
2. Fully lower the platform.
WARNING
The following procedure must be done from the
ground outside of the platform. If you do not obey,
there is a risk of death or serious injury.
3. Turn the main power disconnect off.
4. Press the foot pedal
1
on the platform.
5. Push the platform until the maintenance lock
engages.
1
6. Locate the platform maintenance lock
mechanism underneath the platform.
7. Pull and hold the handle
2
to unlatch the
platform locking mechanism.
8. Fully pull the platform to the maintenance
position.
2
9. Open the hydraulic/electrical compartment
cover.