EasyManua.ls Logo

SLE SLE1000 - Maintenance Schedule; Service Requirements and Schedule

SLE SLE1000
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 110 of 128
22. Maintenance schedule
22.1 SLE1000 service requirements
The user shall perform a functional test as described in the user manual, prior to each
session of use. Equipment which is determined during use not to function correctly or is
otherwise in need of repair or maintenance shall not be used until all necessary repairs and/
or maintenance have been completed and an authorised service representative has certified
that the equipment is fit and ready for use.
In addition, periodic planned preventative maintenance and/or reconditioning overhaul shall
be performed by an authorised service representative. The plan assumes an annual use of
4,000 hours. The planned maintenance should be brought forward if the actual use exceeds
the assumed number of hours. However, the plan should not be delayed if the actual use is
less than the assumed number of hours – due to fact that certain ageing still occurs, even if
the device is not in use (e.g. seals, oxygen cell and battery).
22.2 Maintenance schedule
The SLE1000 has the following planned maintenance / overhaul schedule.
12 months preventative maintenance
24 months preventative maintenance
36 months preventative maintenance
48 months preventative maintenance
Note: Remove the battery fuse if the SLE1000 is stored for longer than 2
weeks, whilst disconnected from the mains. The power button detection
circuit consumes a small amount of current, which can cause the battery to
discharge over a long period.

Table of Contents

Related product manuals