EasyManua.ls Logo

Sofar HYD 5KTL-3PH - Connections

Sofar HYD 5KTL-3PH
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HYD 5/6/8/10/15/20KTL-3PH USER MANUAL
23
inverter's system settings, for example:
System Settings Input Channel Config Bat Channel2
Not Used.
The battery inputs of different inverters should not be
connected in parallel
Each battery tower corresponds to a unique battery
address. “Auto Config. Address” will detect the number
and addresses of the connected batteries automatically
within 2-3 Minutes.
In certain regions there are specific local safety
requirements of the power grid. Ensure to comply with
all local safety requirements.
According to the Australian safety regulations, the
neutral cables on the grid-connected side and EPS side
must be connected together. Otherwise the EPS cannot
be used.

Related product manuals