EasyManua.ls Logo

Sofar HYD 5KTL-3PH - Installation; Installation Information; Installation Procedure

Sofar HYD 5KTL-3PH
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HYD 5/6/8/10/15/20KTL-3PH USER MANUAL
22
3.6 Connecting BTS 5K batteries
Using SOFAR's own battery module BTS 5K is a way to build
scalable battery systems. A BTS E5-DS5 battery system has a
nominal capacity of 5.12 kWh, allowing multiple configurations
for one tower from 5.12 kWh (BTS E5-DS5) to 20.48 kWh (BTS
E20-DS5). The parallel battery are rated at 400V and the
individual battery are rated at 7A.
The HYD 5/6/8KTL-3PH models have one battery input (max.
current 25 A), and the HYD 10/15/20KTL-3PH models have two
battery inputs (max. current 25 A / 25 A).
Below diagram is an example of how to connect the BTS battery
system to SOFAR's HYD 10/15/20KTL-3PH.
Figure. 3-13 System with BTS 5K battery
NOTE
Configuration of the battery setup should only be done
when the inverter is in standby mode!
Advanced Settings 10. Switch on / off Switch Off
If a battery input is unused, ensure to set this in the

Related product manuals