Power-Style™ QED-2 Switchboards Section 3—Receiving, Handling, and Storing
10 © 1988–2018 Schneider Electric All Rights Reserved 80043-055-13
ENGLISH
Follow these instructions to handle the switchboard:
1. Use load-rated cables or chains with safety hooks or shackles. Do not pass
cables or chains through holes in lifting straps.
2. Use a load-rated spreader beam to prevent structure damage. Rig so that the
minimum angle between the lifting cables or chains and equipment top is
45 degrees.
Follow these instructions for laying equipment on its back:
1. Remove shipping skid and equipment back covers.
2. Use overhead cranes, lifting straps, and cables or chains for laying equipment
on its back.
3. Rate of drop or pickup for laying equipment on its back is four feet per minute
or less.
4. Reverse the procedure to stand the equipment in its upright position.
5. Reinstall back covers.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Square QED-2 and is the answer not in the manual?

Square QED-2 Specifications

General IconGeneral
BrandSquare
ModelQED-2
CategorySwitch
LanguageEnglish