8 - PROGRAMMED MAINTENANCE TMM50-TAB001.2
2
3
12
1
4
7
6
6
6
6
11
8
11
5
13
Operation Procedure
6 Lubrication of drawing-in articulations Without maintenance
Frequency: Weekly
1 Check oil level (See "Check oil level", page 43)
2
Verification of the oil level in the pump
reservoir
(See "Verification of the oil level in the pump
reservoir", page 44)
3 Level the frames at least 1 time
Refer to the weaving machine manual
provided by the manufacturer
Frequency: 3 weeks Weekly Cotton or wool type weaving
4 Clean the filter (See "Clean the filter", page 46)
Frequency: With each warp change without exceeding 1 month
5 Lubrication of clamping loop joints
(See "Lubrication of clamping loop joints",
page 50)
7 Clean the drive shaft (See "Clean the drive shaft", page 49)
8 Lubrication of harness motion stabilisers
(See "Lubrication of harness motion stabilis-
ers", page 51)
9 Lubrication / greasing of frame attachments
DRC10: (See "Maintenance of the links of
frame clamping loops "DRC10"", page 52)
13 Cleaning of the levers (See "Cleaning of the levers", page 50)
Frequency: With each item change without exceeding 4 months
10
Lubrication of the lock of the frame brack-
ets "DRC10"
(See "Lubrication of the lock of the frame
brackets "DRC10"", page 53)
11 Lubrication of harness motion lever joints
(See "Lubrication of the harness motion
lever shafts", page 56)
8 - Programmed maintenance
1781 B1 DRC10 © Stäubli 2013 – F.143.489.04-C 61/62