EasyManua.ls Logo

STIEBEL ELTRON DHE 18/21/24 - Installation Clearances and Water Connection; Required Clearances; Water Installation Steps

STIEBEL ELTRON DHE 18/21/24
356 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.stiebel-eltron.com DHE | 75
INSTALLATION
Preparation
ENGLISH
Oversink installation
D0000057030
12
1 Cold water inlet
2 DHW outlet
Note
Mount the appliance on the wall. The wall must have
sufficient load bearing capacity.
9.2 Minimum clearances
≥50≥50
≥90
≥90
D0000060809
Maintain the minimum clearances to ensure trouble-free op-
eration of the appliance and facilitate maintenance work.
9.3 Water installation
Flush the water line thoroughly.
Fittings
Use appropriate pressure taps. Open vented taps are not per-
missible.
Note
Never use the 3-way ball shut-off valve in the cold water
inlet to reduce the flow rate. The 3-way ball shut-off valve
is intended only to shut off the cold waterinlet.

Table of Contents

Related product manuals