EasyManua.ls Logo

Stryker Operating Room Information System - Scope

Stryker Operating Room Information System
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
S
1. Scope
is document describes the rough-in requirements and specications for Stryker Operating Room
Information System (ORIS) equipment. It covers pre-installation requirements for all electrical and
information systems services needed. It does not describe in detail the installation of this equipment
which is accomplished by Stryker Communications' technicians.
Note Please refer to the Boom and Lights Pre-Installation Manuals for mechanical and
structural requirements for Stryker equipment booms, surgical lights, at panel
arms, and navigation arms.
Note Junction boxes are called out in this manual. e term dual gang junction box
with single gang mud ring refers to an actual dual gang junction box with an
adaptor that is designed for attachment of a single gang wall plate. is provides
more internal room for cabling and wire termination. e exact type used de-
pends on local building codes and electrical standards.

Table of Contents

Related product manuals