4
S
1. Scope
is document describes the rough-in requirements and specications for Stryker Operating Room
Information System (ORIS) equipment. It covers pre-installation requirements for all electrical and
information systems services needed. It does not describe in detail the installation of this equipment
which is accomplished by Stryker Communications' technicians.
Note Please refer to the Boom and Lights Pre-Installation Manuals for mechanical and
structural requirements for Stryker equipment booms, surgical lights, at panel
arms, and navigation arms.
Note Junction boxes are called out in this manual. e term dual gang junction box
with single gang mud ring refers to an actual dual gang junction box with an
adaptor that is designed for attachment of a single gang wall plate. is provides
more internal room for cabling and wire termination. e exact type used de-
pends on local building codes and electrical standards.