Installation STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
7.4.2.2. Drain connection
Proceedasfollowstoconnectthedrain:
3
Useacliptoxthedrainagehosein
place.
4
Insert the valve in the hose.
5
Connect the other end of the hose to the
local waste water system.
2
Pushthedrainagehose(insidediameter
11mm)overthetting.
1
Remove the screw plug.
Valve
48VAC(forUSM/USS)
230VAC(onlyforON/OFFcontrolmodule)
"3.1. Optional accessories" on page 13
Connection to a drainage pipe with solenoid valve is only necessary if the water needs to be drained
duringlongerperiodsofultrasonichumidierdowntime,duetohygienerequirements.
O-ring and plug included in product package
(requiredonlyfortransport)
The hose is pushed on.
(Threadisrequiredonlyfortransport)
Waste water pipe 1/2", provided
by plant operator
Drain connection
Waste water pipe 1/2", provided
by plant operator
by plant operator