DE / 06-2016 / 1000687 © STULZ GmbH, Hamburg
-
54
-
Start-up STULZ UltraSonic -System for duct humidication ENS 14 A - 18 A-
8. Start-up
All steps from section "7. Installation" on page 31 must have been completed prior to start-up.
CAUTION
Electrical connections are secure.
After transport/delivery, check that electrical connections are secure and re-tighten if necessary.
WARNING
CAUTION
No obstacles in the blow-out area.
There must not be any obstacles in the blow-out area of the unit. Risk of condensation!
IMPORTANT
CAUTION
Stationary water in pipes.
Do not operate the humidier with stationary water in the pipes.
IMPORTANT
CAUTION
Alignment with airow.
Align the humidier in the direction of the airow.
IMPORTANT
CAUTION
Water and power supply.
Make sure the ultrasonic humidier is supplied with electrical power and demineralized water.
IMPORTANT
CAUTION
Space for maintenance and repair work.
The installation clearances from section "7.2. Installation clearances" on page 36 must be adhered to.
CAUTION
Check all connections.
Route and connect all power cables and water supply pipes correctly, securely and safely.
IMPORTANT
CAUTION
Operation < 0°C.
Do not operate the humidier if the room temperature drops below 0°C!
●
Drain the water tank of the unit.
IMPORTANT