EasyManua.ls Logo

Sun Microsystems Sun Fire V890 - Tools, Equipment, and Documentation Required; Preparing the Server

Sun Microsystems Sun Fire V890
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Sun Fire V890 Server Rackmounting Guide May 2004
Tools, Equipment, and Documentation
Required
The following tools, equipment, and documentation are required when
rackmounting the server:
Phillips No. 2 screwdriver
Phillips No. 1 screwdriver
Level
Flat blade screwdriver
Adjustable wrench
Masking tape or felt tip pen
Antistatic wrist strap
Antistatic mat
Sun Fire V890 Server Owners Guide
Sun Fire V890 Server Service Manual
Preparing the Server
To prepare the server for rackmounting, a qualified service technician should
complete the following tasks:
Power off the system and disconnect the server’s power cords, network cables,
and I/O cables. See the Sun Fire V890 Server Service Manual for instructions.
Remove all power supplies, CPU/Memory boards, I/O fan trays, and CPU fan
trays. See “Remove Components” on page 9.
Remove the side door handles. See “Remove the Handle From Each Side Door”
on page 10.
Remove the fenders and lower side panels. See “Remove the Fenders and Lower
Side Panels” on page 13.
Install the lifting handles. See “Install the Lifting Handles” on page 15.
Attach the cable management bracket to the back of the server. See “Attach the
Cable Management Bracket to the Server” on page 16.

Table of Contents

Other manuals for Sun Microsystems Sun Fire V890

Related product manuals