20
PPaarraammeetteerrss
DDeessccrriippttiioonn
FFuunnccttiioonn
CCoommmmiissssiioonnii--
nngg//CCeeaassiinngg
Commissioning
Carry out reactive power control
according to the planning curve
Ceasing
—
LLooccaall//RReemmoottee
Local
Set the planning curve locally for
control
Remote
Receive the planning curve issued
by AGC for active control
CCoonnttrrooll DDeeaadd
ZZoonnee ((kkvvaarr))
Default value 10.000
Set the value according to actual
situation
SSllooppee CCoonnttrrooll
Commiss-
ioning
Rising Gradient
(%Qn/min)
Control the gradient of power rising
Falling Gradient
(%Qn/min)
Control the gradient of power falling
Ceasing
—
When setting the llooccaall//rreemmoottee status, it must be consistent with the llooccaall//
rreemmoottee status of the plant lumped parameter, otherwise the policy will not be
executed.
step 3 TTeemmppllaattee EExxppoorrtt, FFiillee IImmppoorrtt and FFiillee EExxppoorrtt operation steps refer to"6.4.2 Planning
Curve" .
step 4 Click SSaavvee to complete the setting of the planning curve parameters for reactive control.
-- -- EEnndd
6.6 Stable Control/Fine Cut
The energy storage system can provide full power support for a short period of time if
receives a digital input signal indicating that the receiving end grid needs emergency
power support.
step 1 Click CCoonnttrrooll MMeetthhoodd→→SSttaabbllee CCoonnttrrooll//FFiinnee CCuutt to enter the corresponding interface.
step 2 Click
to set the status of the FFuunnccttiioonn CCoommmmiissssiioonniinngg//CCeeaassiinngg and to set the
parameter values for DDuurraattiioonn. Click SSaavvee to complete the settings.