Safety Precautions
1.1 Personal Requirements
The hoisting, transportation, installation, wiring, operation, and maintenance of the ESS
must be carried out by professional electrical technicians in accordance with local
regulations. The professional technician is required to meet the following requirements:
Should know electronic, electrical wiring and mechanical expertise, and be familiar with
electrical and mechanical schematics.
Should be familiar with the composition and working principles of the ESS and its front-
and rear-level equipment.
Should have received professional training related to the installation and commissioning
of electrical equipment.
Be able to quickly respond to hazards and emergencies that occur during installation and
commissioning.
Be familiar with the relevant standards and specifications of the country/region where the
project is located.
1.2 Electrical Safety
Touching the power grid or the contact points and terminals in the devices
connected to the power grid may lead to electric shock!
The battery side or the power grid side may generate voltage. Always use a
standard voltmeter to ensure that there is no voltage before touching.
Lethal voltages are present inside the product!
Note and observe the warnings on the product.
Respect all safety precautions listed in this manual and other pertinent
documents.
Respect the protection requirements and precautions of the lithium battery.