24
The place should be firm and flat with good drainage and no obstacles or outshoots.
The PCS should be placed and supported by the four feet.
5.2 Hoisting PCS
5.2.1 Safety Precautions
Strictly follow the safety operation rules of the crane in the process of hoisting.
Standing within 5 to 10 meters of the hoisting areas is strictly forbidden! Any-
body standing under the boom or PCS is strictly forbidden in the whole hoisting
process.
The hoisting work must be stopped in violent weather days. For example, in
strong wind, heavy rain, or thick fog conditions.
Please carefully observe the following items:
All safety requirements must be met.
A professional instructor is needed in the whole hoisting process.
All the slings used should be able to withstand a minimum load of 30t.
The arm length and radius of gyration of the crane should meet requirements.
All the connection point must be firmly connected.
The length of the slings can be adjusted appropriately according to on-site conditions.
Transport the PCS in a level, smooth and steady way.
Transport the PCS by the four top corner fittings.
Some accessories may be needed to ensure the hoisting safety.
The following figure illustrates the hoisting operations. Circle A describes the work areas of
the crane. Anybody standing inside the circle B is forbidden for safety considerations.
5 Mechanical Mounting System Manual

Table of Contents

Other manuals for Sungrow SC3150UD-MV-US

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SC3150UD-MV-US and is the answer not in the manual?

Sungrow SC3150UD-MV-US Specifications

General IconGeneral
BrandSungrow
ModelSC3150UD-MV-US
CategoryStorage
LanguageEnglish

Related product manuals