Hoist the PCS in a vertical manner. Do not drag or drop it on any surface.
Suspend the hoisting when the PCS is lifted 300mm from the supporting surface to check
the connection between slings and the container. Continue hoisting only after confirming
a reliable connection.
Place the PCS lightly and smoothly when it is in place.
The final location should be firm, level, and well-drained. The PCS is supported by four
bottom fittings on the ground.
The PCS should be hoisted by four top corner fittings as shown in the following figure.
figure 5-2 Hoisting by top fittings
5.3 Foundation
5.3.1 Installation Site Selection
When selecting the installation site, consider at least the following requirements:
The installation location should be as far as possible away from chemical plants and
salt-affected areas. If it cannot be avoided, the later inspection and maintenance cycle
should be shortened.
5 Mechanical Mounting System Manual

Table of Contents

Other manuals for Sungrow SC3150UD-MV-US

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SC3150UD-MV-US and is the answer not in the manual?

Sungrow SC3150UD-MV-US Specifications

General IconGeneral
BrandSungrow
ModelSC3150UD-MV-US
CategoryStorage
LanguageEnglish

Related product manuals