EasyManua.ls Logo

Suzuki GSF600SK2 2002 - Page 188

Suzuki GSF600SK2 2002
380 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-24 CHASSIS
Clearance
FWD
Tighten the steering stem head nut to the specified torque.
""
""
" Steering stem head nut: 65 N
.
m (6.5 kgf
.
m, 47.0 lb-ft)
NOTE:
Before tightening the steering stem head nut, temporarily install
the front forks.
HANDLEBAR AND FRONT FORK
When remounting the front fork, align the upper surface of the
inner tube with the upper surface of the steering stem upper
bracket.
Tighten the front fork lower pinch bolts 1 and front fork upper
pinch bolt 2 to the specified torque.
""
""
" Front fork lower pinch bolt 1:
23 N
.
m (2.3 kgf
.
m, 16.5 lb-ft)
Front fork upper pinch bolt 2:
23 N
.
m (2.3 kgf
.
m, 16.5 lb-ft)
NOTE:
First tighten the handlebar holder bolts
A
to the specified torque.
""
""
" Handlebar holder bolt: 23 N
.
m (2.3 kgf
.
m, 16.5 lb-ft)
Install the front wheel. (! 5-11)
Set the handlebar to match its punched mark to the mating
surface of the handlebar holder.
Set the punched mark on the handlebar holders as shown in
the photograph.
Tighten the handlebar holder bolts 3.

Table of Contents

Related product manuals